Saturday, July 6, 2013

In Arlington, state wants to develop and build over I-66 in Rosslyn, East Falls Church Metro, WaPo, July 3, 2013

By Tom Jackman
Ross66
The proposed area in Rosslyn where Virginia is asking for possible development suggestions. The area in pink is the main area, the areas in light green are secondary possibilities. (Office of Transportation Public Private Partnerships)
Air rights are rapidly becoming a hot topic in Northern Virginia. Some heavy-hitters in Fairfax are pushing for development over the Silver Line stations on the Dulles Toll Road. And on Wednesday, Gov. Bob McDonnell (R) announced that the state is seeking ideas from private developers about building over Interstate 66 in Rosslyn, and over the tracks leading to the East Falls Church Metro station, both in Arlington County.
 Click here for the rest of this article. 

RCA Reston 2020 Committee has been pushing for the acquisition of air rights over the Dulles Toll Road for more than two years as well.  A letter from RTF Chairman Patty Nicoson to MWAA asking about the idea was rejected as being infeasible, even though the cost will be much less if done in conjunction with Phase 2 Metro construction than later.  Moreover, with real estate markets in their currently relatively depressed state, the real estate related cost of doing so would be less than in the future.  Supervisor Pat Herrity is exploring further the feasibility of the idea as a way to reduce toll increases on the DTR.  Our interest focuses developing the area nearest the rail stations (assuring greater transit use) and finding open space to accommodate the tens of thousands of new residents and workers in the TOD area. 

Monday, March 25, 2013

Fairfax County Could Sell Air Rights to Fight Tolls, Reston Patch, March 25, 2013

With tolls projected to increase, officials are looking into air rights sales.

Fairfax County is exploring how selling air rights could help reduce tolls on the Dulles Toll Road that are expected to shoot up with Phase II Silver Line construction.
Supervisor Pat Herrity (R-Springfield) asked staff last week to look into the cost of a study determining how much money the county could charge developers for the right to build over the Toll Road and new Silver Line Metro stations. . . .
  Click here for the rest of this important article.

RCA has taken the position in responding to the draft areawide Comprehensive Plan language presented to the Reston Task Force by County Staff last month that "The County must aggressively pursue air rights over the Dulles Corridor for TOD development and the grid of streets to work effectively."

The County staff's response: "The subject of pursuing air rights is very complex.  If the opportunity to develp the air rights over the Toll Road comes to fruition, updates to the Comprehensive Plan will be needed."

Talk about a "That's not my job" response!

Air rights are vital for both a complete grid of streets to support transit-oriented development in the station areas and to help ease the burden of tolls on Restonians and the thousands of others who use the toll road.  

 



Thursday, February 24, 2011

Notes on the RTF Meeting, February 22, 2011, Terry Maynard

Notes on the
Reston Task Force Meeting
February 22, 2011
 

Public Comment

Marion Stillson, President, RCA, endorsed the Vision and Planning Principles statement prepared by the Vision Committee on behalf of RCA.  She thanked the Steering Committee for its contributions as well.  (See the text of her comments here.)

Rob Whitfield asked for a moment of silence in remembrance of Dave Edwards, long-time Restonian and major contributor to Reston planning.   Chairman Patty Nicoson noted that there would be a memorial service for Dave at the Universalist Unitarian Church on March 12th.

Administrative Items

Patty Nicoson--
  • Noted she had attended a Metrorail meeting looking at some new ideas, but they were costly and there few dollars available.
  • Attended the Jan. 31 Herndon planning meeting to discuss development around the Herndon-Monroe station.  Developers discussed the matter in the morning and the Town Council spent the afternoon discussing potential development.  In general, they leaned toward the FAR 4.5 option (vice 2.5) although they considerably narrowed the area for that level of development0.  They expressed concern about a triple left-hand turn into area parking and a number of bad intersections.
Heidi Merkel, DPZ staff, followed up noting that DPZ had met with the Herndon planning staff and chairs of the RTF Herndon-Monroe committee.  She noted that Herndon’s and the RTF’s timeframes were roughly the same for concluding their efforts.  She had no information on Herndon’s view of the station name.

Mike Cooper, RTF member, whose company also has interests in Herndon, noted that Herndon is taking a longer term view for its planning, in part because the area of interest already has a number of 4-5 story buildings. 

Heidi also noted that DPZ is developing an approach for Phase II (Village Centers and Residential Areas) of the RTF.  Staff had met with Supr. Hudgins for her inputs, and she thought the staff would have a preliminary schedule ready for the March 15th RTF meeting.

Patty Nicoson provided feedback from the Dulles Construction Committee of MWAA’s discussion of air rights over the Dulles Corridor.   An engineering analysis suggested that it was technically feasible to build needed foundations either now or in the future, and that there was insufficient economic return to justify that move now.  (See the analyses and recommendation here.)  It was also noted by MWAA’s legal counsel that MWAA does not have the authority to do work that does serve an “airport purpose,” and would need to seek federal legislative relief to correct that deficiency.  Committee members asked for a revenue perspective from developers on future air rights development.  The Task Force agreed to have the Chairman send MWAA a letter expressing their continuing interest in obtaining air rights for development over the Dulles corridor.

According to Patty, the schedule for Phase II of the Metro line will probably slip, although they have not officially acknowledged that slippage yet.  MWAA is looking at three alternatives for the station at Dulles airport.  She noted that Phase I of the Metro line has been 30% completed.
Patty noted that the Perspectives Group will help facilitate future discussions of the Task Force as it discusses needed decisions regarding Phase I (the TOD areas).
Heidi Merkel gave a presentation on the role of the Steering Committee.  She began by noting that the Task Force’s role was to guide the staff (DPZ) in the drafting of new Comprehensive Plan language.  She walked through its objectives, the use of checklist, etc.  (This is her presentation.)  Task Force member Dick Kennedy urged the Steering Committee to check back in with the Task Force regularly on its activities. 

Patty also summarized the work of the Steering Committee over the last two months.  (See Reston 2020 notes on these meetings on the blog.)

Bob Simon noted that the Village Centers (VCs) were receiving short shrift in the Vision and Planning Principles (V&PP) statement because the task force effort was divided into two parts.   He expressed concern that the V&PP statement mis-stated the importance of greater density in the VCs.   In response to a question from Peter Otteni, Task Force member, about how the Task Force could deal with the VC issue, John Carter (Co-Chair, Vision Committee) noted that it would be addressed in their report.  Heidi also noted that it was being given some consideration in the Steering Committee.  Patty noted that there was a door open to return to the planning principles based on the results of Phase II of the Task Force. 

Dick Kennedy noted that Gerry Volloy’s piece on governance sent to the Task Force was important.  He said he was not sure where it fits, but it needs to be addressed.  It has implications for open space, trails, etc.  He expects addressing the issue will be difficult because of the number of stakeholders, the legal ramifications, etc.  Patty noted the Steering Committee will address implementation mechanics.


Kohann Williams, co-chair of the Vision Committee, provided the backdrop for the V&PP statement, noting that they reached consensus on what was before the Task Force that evening.  She noted the intent to discuss the draft in detail tonight and vote on it at the March 15th meeting. 

Robert Goudie raised the concern that the brief statement about residential areas may not be sufficiently strong to meet Restonians needs to protect neighborhoods from encroaching growth.  There was a brief discussion of both protecting the rights of neighborhoods to decide their own futures so long as they did not affect the rights, values, and quality of life of their neighbors. 

John Carter, co-chair of the Vision Committee, followed up by noting the Vision Committee’s plans to wrap up its report. 

There being no additional discussion, Chairman Nicoscon adjourned the meeting about 20 minutes early.  The next meeting of the Task Force will be on March 15. 


"Air rights weighed near future Reston Metro station," Fairfax County news in brief, Washington Post, February 24, 2011


The Metropolitan Washington Airports Authority board of directors is evaluating whether to install foundations around the planned Reston Parkway Metrorail station that would later allow the authority to sell development rights above the station and the Dulles Toll Road.

Steve Smith, of the airports authority's Office of Engineering, told the board last week that the Reston market likely will not be ready to absorb the density needed to facilitate "air rights" development anytime soon. Air rights above the new rail stations would essentially involve constructing buildings on platforms above the future rail stations and toll road. . . .

Click here for the rest of this WaPo article. 

Friday, February 18, 2011

Dulles Corridor Air Rights--Analysis and Recommendations, February 2011

The Reston Task Force has received two brief papers concerning the practicability of building foundations to develop air rights over the Dulles Corridor.  The bottom line from these two papers is that it is not economically reasonable to build them now and future construction over an already built Metrorail line will require 150' long spans that cost about 30% more than the 60' spans that could be constructed now. 

Analysis & Recommendation for Air Rights Over the Dulles Corridor,  Final Paper, February 2011                                                                   
Feasibility Study--Technical Report on Air Rights Development over the Dulles Corridor, Appendices A and B                                                                   

Wednesday, October 6, 2010

RCA Letter to MWAA re Dulles Toll Road Air RIghts, September 29, 2010, Marion Stillson, RCA President

Lynn Hampton
Acting President and CEO
Metropolitan Washington Airports Authority


Ms. Hampton,

I am writing as President of the Reston Citizens Association (RCA), an organization founded in 1967. Our mission is to protect and promote the founding principles of Reston, established as a pioneering new town.  Foremost among the founding principles are the ideas of community and of comprehensive planning. As long as Robert E. Simon, Jr., owned the land, he was able to foster these goals. Ownership is now scattered among thousands of entities.

When the Dulles Access Road split Reston in two, the community suffered a body blow. The addition of the Toll Road further separated the north and the south halves of our community. With the advent of metrorail comes the possibility of increasing the number of bridges connecting north and south Reston. This is because current transportation infrastructure cannot support the increased population and number of jobs in future transportation-oriented development close to Reston’s three stations and along the Dulles corridor. Obvious ways to alleviate traffic congestion are to supply additional bridges and/or tunnels, particularly near the Reston stations.

Such bridges and tunnels, whether for pedestrians, bicycles or vehicles would serve not only the success of rail in Reston, but the re-connecting of our two halves. They are also very costly and are not likely to be funded in the near future. In the interests of optimal town planning, RCA urges MWAA not to build anything into the Dulles Rail Project that could preclude future bridges and tunnels.

RCA also supports the concept of future air rights in buildings over the Dulles Toll Road. Please do all you can do now to ensure that actions today do not preclude this possibility in the future. 

RCA is represented on the Reston Master Plan Special Task Force, and has a land-use committee which monitors Task Force work closely. We intend to do all within our power to ensure that the Fairfax County Master Plan, when amended.  fosters Reston as a community, and makes plans comprehensively to the extent possible in the free market. We ask your help in the areas which you control. 

Sincerely,
Marion Stillson
President
Reston Citizens Association

Tuesday, September 21, 2010

Notes on Reston Task Force Meeting, September 14, 2010, Dick Rogers & Marion Stillson

1.  During the administrative portion of the meeting, the Task Force agreed in principle to support a letter from the Vision Committee to MWAA, as they get their air-rights study results (within a month), asking MWAA not to take steps which will preclude future air rights.
 
2. Heidi Merkel, FC DPZ, outlined the near term schedule for the Task Force::
  •  28 Sept.  Wiehle sub-com will report tentative conclusions (this changes what she said at the RTC Committee meeting in the morning when she said TC would go then!)
  •  5 October. Special presentation on Design and Architecture.
  •  12 Oct.  TC Committee will present what will presumably be its final report.
  •  26 Oct.  At last the county transportation presentation. 
Click here for the full presentation. 
 
She indicated that the reports prepared by the Task Force would go through a rigorous staff review, which drew no general reaction from the Task Force. She was talking about staff performing two tasks:  
  • Putting TF recommendations into CP language was one, and I think many felt relief that the TF would not have to do this. 
  • The second staff task was assessing the impact of TF recommendations against such measures as the GMU forecasts. There was an explicit TF reaction to the latter, though it might have been at another point in the evening, I'm not sure:  This reaction was to decry the GMU horizon of 40-50 years as too great, 20-30 years being more realistic. However, Heidi appeared to stick with the 40-50 year horizon. 
Someone asked her what the timeframe was for the final stages of Phase 1, and she hesitated very long before saying "the first half of the year."  I think people were so surprised at going beyond December 2010, that no one asked about Phase 2 (which will consider the Village Centers and Reston's residential areas).
 
3.   John Carter presented the Vision Committee's principles and preliminary overview.  They were well received. He drew particular reaction on a couple of points:
  • The Soapstone overpass across the DTR should be built soonest. Question: With what money?
  • We should be thinking of extending the Reston tree canopy, not reducing it.  (He cited a County figure of 45% tree cover up from the current 38%.)  Skeptical developers and TODers were on this one at this morning's Wiehle mtg.
  • Where are the places for quasi-industrial type uses like storage facilities, which are not generally being thought of?
  • Village Centers: He noted potential concerns--something to think about--that the VCs might be undercut by retail in the TOD areas. 
In other comments during his presentation,
  • He honored' Reston 2020 explicitly by saying his report's transportation segment uses Reston 2020 maps. 
  • At least three times he also remarked that there are 5 "failing" intersections near where the stations will be, with no satisfactory plans to improve them. In imitation of "Houston, we have a problem" he said, "Reston, we have a problem." It's no exaggeration to say he emphasized this issue, legitimately so, in my opinion.
Mike Cooper of Brandywine (a very pro-office developer) raised some questions about John's slide on residential-commercial growth which implied lots of the former and less of the latter. He stressed the need to continue to attract jobs.
 
4.  Herndon-Monroe Committee Report--The presentation largely followed that of their draft paper.
  •  Protect established commercial/office sites was emphasized but more mixed use and residential and TOD in A-2 and C-2 (the station area) was allowed for than the draft paper suggests.
  •  Protect wetlands drew applause.
  •  Paul Damory of Polo Fields thanked the committee for, in effect, protecting his neighborhood.
(Comment: I continue to find them a bit vague on improved access to the station from Monroe and FCP; also they do not really embrace the Joe Stowers proposal to convert the existing access ramp into a link to Herndon.)
 
5.  Sandi Smith of DPZ gets married Saturday--gone for two weeks!

Thursday, September 16, 2010

Letter: Concerns about Phase II of the Silver Line, Dave Edwards, September 14, 2010

Lynn Hampton, Acting
President and CEO
Metropolitan Washington Airports Authority


Ms Hamilton;

I am very pleased with the aggressive posture the Dulles Corridor Rail Project has been taking. I am pleased that there is a concerted effort to attempt to maintain seamlessness between Phase 1 and Phase 2 of the project.

I must express some concern about certain elements of the project which still may be possible to affect:

1. Because the Dulles Access/Toll Road has created a high degree of schizophrenia within Reston by limiting the number of points of interchange between north and south. For this reason we are especially sensitive that nothing built into the Dulles Rail Project preclude future bridges or tunnels that may be possible to cross the Dulles Corridor and lessen the congestion associated with the funneling effect of a limited number of current crossings.

2. Likewise we are extremely supportive of any potential effort to allow for future building in air rights in the Dulles Corridor connecting north and south Reston. There are indications that MWAA may also see some future potential in utilizing it proprietary interest in this. Please do all that can be done to assure that no action today precludes what may be possible in the future.

3. Likewise, while today’s costs are of critical importance, please do all that can be done to assure that future additional access points to the various stations are not precluded. Beyond 2013 and 2016 we want the Dulles Rail system to be flexible enough that significant improvements can be added as the ridership demand and the availability of additional funding permit.

4. Of particular importance, please do not let short-term expediency, and the severe shortage of funds cause a less than effective Dulles Rail interface with the air terminal at Dulles result from a bad compromise in design. We greatly appreciate the care being taken by the Dulles Rail team to effectively manage the very scarce funding available. However, this critical element of the project must function effectively for at least the next fifty years. Let’s make no short-term expedient decisions today that reduce the long-term effectiveness of Dulles Rail for airline passengers and employees at Dulles. By whatever means, including more Toll Road tolls, let’s find the money to achieve the optimum Dulles Rail interface with the Dulles terminal.


David A. Edwards

Friday, September 10, 2010

Overview of Herndon-Monroe TOD Area Draft Recommendations, RTF Herndon-Monroe Committee

Overview of Herndon-Monroe TOD Area Draft Recommendations

Transportation--A Vision Committee Section Draft, Joe Stowers, September 1, 2010

Transportation
September 1, 2010
Joe Stowers



1. Overview – A composite of existing plans and RMPSSTF

2. Vision – To support Simon’s goals

3. Goals and Priorities – John Bowman

4. Principal Recommendations

• Terri Phillips’ composite map
• County’s evaluation process
• Priorities for 2013
-- Soapstone crossing
-- Locations for foundations for crossings
• Priorities for 2016-17
• 4:1 residential/commercial GFA ratio
• Parking transition at Wiehle and Herndon-Monroe
• County evaluation process

5. Specific Recommendations

• Priorities
• Air Rights
• Connectivity
• Pedestrian and Bicycle Improvements
• Bus Service
• Traffic Signal Optimization








Transportation

Draft of a Section of the Vision Subcommittee Report
Reston Master Plan Special Study Task Force
Joe Stowers, Terri Phillips, and John Bowman
(Bullets with an asterisk (*) after them are candidates for deletion from final draft)

Overview:
This is a compilation of draft materials from the three Reston Master Plan Special Study Task Force station area subcommittees, the Reston 2020 Transportation Work Group, the 2008 RMAG consultant’s report prepared by VHB, the RMAG final recommendations in a July 14, 2008, letter to Supervisor Hudgins, the 2009 Fairfax County Transit Development Plan, and other selected papers prepared for the RMPSS Task Force.
This draft reflects the current perspective of the Vision subcommittee.

Vision:
Transportation in Reston, and particularly in the station areas, should be first and foremost a key part of the infrastructure that supports the quality of life as articulated in Robert Simon’s goals. This is in contrast to a common view that transportation is a utilitarian means to provide and support mobility.

Goals and Priorities:
From the perspective of the RMPSS Task Force, transportation should be addressed from three primary functional perspectives: (1) arterial through-traffic including traffic with a rail station destination, (2) traffic having business, retail, or other commercial Reston destinations, and (3) other intra-Reston local access movements. Planning emphasis should be focused on the transportation modes most appropriate for each of these functional uses.
The planning priority for space in the congested station areas for each of these uses should be (1) rail, (2) pedestrian, (3) bicycle, (4) bus, and lastly (5) private auto and other vehicles.
Planning for through arterial traffic which has no origin or destination in Reston should have the lowest priority. Planning for all movements in the station areas should be focused on public transit systems, i.e. rail and bus.
Planning for movements in the station areas for business, retail, or other commercial destinations should have the following priorities: pedestrian, bicycle, bus, and private auto.
Planning for other intra-Reston local access should focus primarily on residents to easily move to and between village centers, town center, other destinations in the station areas, and other parts of Reston.
Existing Dulles Toll Road crossings should be enhanced to provide for smoother vehicle flow as well as expanded bicycle and pedestrian capacity. New additional Dulles Toll Road crossings should be designed to facilitate local intra-Reston movement -- there should be an emphasis on pedestrian, bicycle, and bus DTR crossings.
In all instances safety for all modes should be a top priority.
Ease of Wayfinding should be an important part of station area planning for all types of movements including graphics in the rail station and bus transfer facilities, as well as directional signing near all major intersections to village centers, town centers, and other important places..

Principal Recommendations:
• Exhibit 1 on the following page is a composite map of the 3 station areas showing in somewhat simplified form the draft recommendations of the 3 station area committees, RMAG, and selected other recommendations prepared for the RMPSS Task Force. The map shows grids of local streets, off-road bike routes, new crossings of the Dulles highway including possible locations for air rights development, which of course could provide additional crossings of the Dulles highway. This map has been simplified to achieve some degree of consistency and thus provide a draft of what might become an important input to the County's planned transportation impact evaluation of possible future development opportunities.
• The County staff is planning to evaluate the impact of possible future development in the station areas. Its ability to effectively perform this evaluation taking into account the recommendations illustrated in Exhibit 1, as well as in evaluating the impact of other recommendations coming from the 3 station area subcommittees and the Task Force, such as targets for balance of residential and commercial uses in each station area, depends on the analytical methods used. It is our belief that the ability to achieve this objective depends on whether the County decides to implement our recommendations on how the transportation impact evaluation process should be performed. This recommendation is outlined in the last bullet in this section, and elaborated on in the last bullet in this draft report.
• Short-term priorities should emphasize the key improvements that need to be completed before rail service begins at Wiehle Avenue station in 2013, including all Reston on Foot station area pedestrian and bicycle improvements, and very importantly, the Soapstone Drive extension, as recommended in the RMAG (see Exhibit 2) and 2020 reports as described below under “Specific Transportation Recommendations.”
• Priorities for improvements to be completed by the beginning of Phase 2 rail operations should be as included in the RMAG report (see Exhibit 2), the final letter recommendations of the RMAG (listed under “Specific Transportation Recommendations”), and most of those in the 2020 report.
• In order to facilitate all recommended crossings of the Dulles highway, specific locations for footings of these structures should be made by Fairfax County to the Airports Authority as early as possible, but no later than the Fall of 2010.
• In order to make possible air rights development at any time in the future, Fairfax County should make recommendations to the Airports Authority for the specific locations desired at both the Town Center and Herndon-Monroe station areas, as early as possible, but no later than the Fall of 2010.
• The alignment of Soapstone Drive extension should be as shown in the RMAG report, as shown in Exhibit 2. *
• The RMPSS Task Force should recommend that the Comprehensive Plan include a target for each of the Reston station areas of all new development of a ratio of 4:1 for residential to commercial gross square feet in order to minimize, and ideally reduce, motor vehicle traffic on the arterials and collectors serving these areas.
• Fairfax County should perform a legal analysis as soon as possible of the extent of the binding commitment of the Record of Decision (ROD) to approximately double the number of parking spaces at the Herndon-Monroe station, recognizing that that ROD was formalized prior to the Federal Transit Administration’s decision to separate the Dulles rail project into two phases and later to enter into a Full Funding Grant agreement for only the first phase extension of Metrorail to Wiehle Avenue. Phase 2 of Dulles rail has received only very limited Federal funding for support of borrowing costs as part of the Stimulus funding. *
• Parking at both Wiehle Avenue and Herndon-Monroe should be transitioned from highly subsidized rail-access parking to parking required to support affordable housing and other components of TOD as soon as practicable after the beginning of operations in these stations. The primary means of achieving this goal is through substantially increasing daily parking fees, perhaps as high as the 2020 report recommends for Wiehle Avenue station – a minimum of $12 per day. Eventually all of the subsidized rail parking should be eliminated as TOD progresses as planned, perhaps by completely eliminating subsidies for rail access parking (which would result in charging close to $20 per day at the Wiehle Avenue station).
• Fairfax County should enter into an agreement with Cambridge Systematics, the firm that performed state-of-the-art transportation analysis for the development of the Tysons Plan, as soon as possible to train County DOT staff in the use and application in Reston of the post-processing TOD planning model used in the Tysons Plan development process.

Specific Transportation Recommendations:

Priorities:
The first priority in terms of timing is completion of recommendations in the station area by the start of rail operations in 2013.
The most important of these, and the most difficult to achieve, is the Soapstone extension across the Dulles highway to the station area. This improvement will provide greater traffic relief than any other improvement beyond those immediate station access improvements required to be built as required by the ROD, such as new turning lanes and other improvements around the Wiehle Avenue-Sunset Hills Road intersection.
Other top priorities include:
-- Additional improvements to the W&OD crossing of Wiehle Avenue that have been developed as a step toward implementation of the Reston on Foot recommendation for this location.
-- Sidewalks along Sunset Hills Road.
-- Bike lanes along Sunset Hills Road, Sunrise Valley Drive, and Wiehle Avenue.
-- Safe crossings of Sunset Hill Road at Isaac Newton Square,
• The second priority in terms of timing should be to complete all recommended station access improvements in the Town Center and Herndon-Monroe station areas by the time rail operations start in 2016 or 2017.
Among the most important of these are:
-- Air rights foundations in both station areas.
-- Conversion of the existing bus-only ramp over the Dulles highway for west-bound traffic into a multi-purpose, two-way route into Herndon, through the cooperation of the Town of Herndon and two property owners on either side of where a new touch-down ramp will be needed.
-- The two recommended access points to the Herndon-Monroe station from Monroe Street and Fairfax County Parkway.
-- The recommended new pedestrian and bicycle access routes to the Town Center station.
-- Construction of new footings for the recommended pedestrian-bicycle crossings of the Dulles highway on the east side of Reston Parkway.
• Priorities for space in the congested station areas should be as recommended in the RMAG report: (1) pedestrians, (2) bicyclists, (3) buses, and lastly (4) private autos and other vehicles.
• Resolution of the legal issue of the binding nature of the ROD’s commitment to approximately double the amount of heavily subsidized parking at Herndon–Monroe should be completed as soon as possible, but no later than this fall. *
• A plan for the transition of parking for subsidized rail parking at Wiehle Avenue and Herndon-Monroe stations to parking to support new affordable housing and other TOD uses should be developed and adopted as soon as feasible. The first steps in implementing these two transitions should be prepared in detail immediately after adoption of the transition plan.

Air Rights:
• The RMPSS Task Force should immediately investigate and resolve specific locations for the foundations for future air rights development at both the Town Center and Herndon-Monroe stations. This should include approximate lengths of these future air rights developments as well as the locations. This should be completed by early this fall to provide timely guidance to Fairfax County in formally requesting that the Airports Authority implement the construction of these foundations as part of construction of Phase 2 of Dulles rail.
• Reston is now on the verge of having sufficient community support to get a public commitment design and build these foundations now. An expression of strong support from the RMPSS Task Force is likely to be necessary to obtain that support. *
• At least two additional things need to be done:
-- Sufficient engineering design work should be done now to convince both the community, potentially interested developers, and concerned officials that there is a practical, safe, and economically feasible way to build future air rights development above the highway and rail system without great interference with highway and rail operations.
-- Sufficient study of all major legal and administrative impediments to building air rights development should be done as soon as possible to assure both the community, potentially interested developers, and concerned officials that there is a feasible path for a good developer to acquire, at a reasonable price, a long-term air rights lease that will facilitate development without great additional cost compared with the approval process of development on private property.



Connectivity:
• Special incentives may be needed in some of the station areas to attract what is being called “First Movers” by the Wiehle Avenue subcommittee. One example that has been discussed in a completely different context in the Town Center subcommittee is the desire by Boston Properties and the other subcommittee members is making new crossings (complete streets?) of the W&OD (probably grade separated) at both Explorer Street and Library Street (now only a pedestrian-bicycle bridge). Another example might be a westward extension of what Comstock is calling “Reston Station Boulevard,” and another is a possible new point of access from Fairfax County Parkway to the west across the Sprint property.
• A critical part of Exhibit 2 is achieving continuous east-west connectivity on the south side of the Dulles highway from Centreville Road to Monroe Street (with an eve side of the Dulles highway from Centreville Road to Monroe Street (with an eventual grade-separated crossing) to the Herndon-Monroe station to Fairfax County Parkway, and on the north side of the Dulles highway from Oracle through Plaza America to the Wiehle Avenue station and Wiehle Avenue. These continuous connections are intended to provide rather slow speed access to and from all properties to the nearest stations, rather than to provide for movements of much more than a half mile which might encourage higher speeds. Design standards need to be developed to achieve “complete streets” of this character. *
• A final product of the RMPSS Task Force this fall should be a carefully prepared list of all the grade-separated crossings recommended to be planned for in each station area. This is important to assist the County and all interested stakeholders and community organizations in guiding plans on a parcel-by-parcel basis to facilitate eventual construction of these crossings. In many cases such early planning can lead to the achievement of these crossings at more moderate cost than stand-alone grade separations, and be of critical importance in providing access to new TOD, such as is now being done in planning for an elevated crossing of Sunset Hills Road from the Town Center station to the Boston Properties site.
• The Town Center circulator proposal of the Town Center subcommittee should be developed into a plan with alignments on specific streets including critical connectivity improvements. A critical question to be addressed is: Should this proposal be (a) in the shape of a circle or oval, or (b) a simple linear north-south shuttle from the Town Center rail station into Town Center North, or (c) two or more linear shuttles?
• Design standards should be developed by Fairfax County for the “complete streets” recommendations of the RMPSSTF station area subcommittees. These standards should include design guidelines for various types of streets including those with retail emphasis as well as streets that are planned to accommodate local bus service, bike lanes, and urban public open spaces.

Pedestrian and Bicycle Improvements:
• More detailed analysis and design work should be performed by Fairfax County for high priority pedestrian and bicycle improvements in the RMAG and Reston on Foot reports, particularly for those projects where space is at a premium and costs of widening are high, such as along Wiehle Avenue, Sunset Hills Road, and Sunrise Valley Drive. *
• The analysis and design work recommended above should include careful attention to the issues of (a) joint use of space by pedestrians and bicyclists in high volume areas, (b) joint use of space by bicycles and motor vehicles, and (c) on-road bike lanes. *
• Much more attention should be paid by Fairfax County to the benefits and costs of “real” traffic calming such as is commonly done in Europe, Canada, and in a few parts of the U.S. A critical part of this, which should be done by the County, is the use of highly specialized design features such as the use of rougher re-surfacing calibrated to slow vehicles down to specific speed ranges, either at critical intersections or for continuous sectors of streets. Europeans consider this so important for safety and enjoyment of streets that they are willing to invest in costly solutions such as cobblestone surfaces. One much less expensive solution which should be more acceptable in this area is the use of stamped concrete, which can be designed to slow vehicles to any desired range of speed.
• We recommend that a demonstration of the application of stamped concrete resurfacing be performed for New Dominion Parkway at all intersections between Reston Parkway and Fairfax County Parkway (excluding those two major intersections). The traffic calming measures for this section of New Dominion that have been recommended so far – a road diet and the addition of a traffic signal at Explorer Street -- will not slow traffic down to a safe and comfortable speed for pedestrians (about 25 mph), but stamped concrete surfaces can easily be designed to do so. Consideration might also be given to continuing such re-surfacing at slightly higher design speeds for one or more blocks of New Dominion between intersections.

Bus Service:
• The RMAG consultant developed and presented to the community in 2008 detailed recommendations for restructuring of bus services in the Reston-Herndon area to provide feeder services for the two primary Reston stations – Wiehle and Town Center. These recommendations were developed in close coordination with Fairfax County DOT staff and were revised as appropriate after community review. In general these services were designed to connect with every other train in the peak period.
• Based to a great extent on refinement of the RMAG recommendations, the County's 2009 Transit Development Plan (TDP) includes recommendations for changes in routes and schedules throughout the County including routes serving the Reston - Herndon area. A table in Chapter 12 of that TDP final report lists each route change recommendation and provides estimates of the change in annual operating costs on a route-by-route basis. Another table in that chapter places 1st priority on restructuring of these services for the introduction of Silver Line services. The total increase in ridership for the Reston services is forecast to be 133,672 per day, and the total for Herndon is forecast to be 146,812 per day. The summary evaluation of these recommended changes is that the cost is estimated to be -$7.09 for the Reston system (i.e., a savings of over $7 per new rider due mostly to eliminating bus services that will be replaced by rail). The cost is estimated to be $2.66 per new rider for changes in the Herndon system. Detailed data on a route-by-route basis for these recommendations and their evaluations are contained in an appendix, which unfortunately is not available on the County web site.
• In general, we believe RMAG and the County have done an excellent job of developing and evaluating these recommendations for restructuring of services to best provide feeder service on the most cost-effective basis. However, we believe it is desirable for each Task Force member who is directly impacted or has a serious interest in these recommended changes to review these recommendations in more detail. To facilitate this, we recommend that the Task Force ask the County to hold a meeting soon to allow people to ask questions about the entire process and report on the status of implementing these recommendations. This would also provide an opportunity for members of the 2020 transportation group to discuss their recommendations, which involve much more extensive increases in service and presumably much greater increases in operating costs. The 2020 recommendations are probably less cost-effective changes because they are not designed to directly connect with train schedules as the County recommendations do.
• The RMAG report recommendations include the addition of bus-only lanes on the Soapstone Drive extension to the Wiehle Avenue station and along Sunset Hills Road between Wiehle Avenue and Old Reston Avenue. We recommend that Fairfax County be asked to evaluate these recommendations in light of the fact that bus operations on these lanes would be limited to a small number of buses using these lanes, and would only be doing so for a brief period every 14 minutes (meeting every other train) in the peak period and less frequently at other times. Perhaps alternatives such as prohibiting all other vehicles from using the “bus-only” lanes, using overhead lane control signals operating in accord with real-time operations of the buses. *

Traffic Signal Optimization: *
• Several years ago VDOT spent several million dollars developing and installing a system for “optimizing” all traffic signals in Fairfax County. Most of the expenditures involved (a) installing thousands of sensors in pavements to measure traffic flows in each lane on signal approaches, (b) hard-wire these sensors to a central computer control system, and (c) having a consultant develop fixed-timing signal controls that would “optimize” traffic flows on all sections of signalized routes for a set of several time periods during the week: weekday peak and off-peak periods, and Saturdays, Sundays, and holidays. *
• The shortcomings of this effort are: (a) such an “optimization” system is based only on minimizing average delay times, which vary widely from day-to-day, for long sections of signalized routes; (b) the system of signal timing in general remains fixed for years until another consultant is hired to update the “optimized” signal controls for each section of signalized route. (this probably does not occur at all during periods of scarce funding such as we have now experienced for several years); and (c) perhaps most importantly, this type of fixed optimization does not respond to real-time variations in traffic flow (except to a limited extent for turn-lane signals). *
• Since software for real-time traffic signal controls has been evolving over several years going back to before the period during which VDOT developed this Countywide signal control system, and since most of that investment has been greatly under-utilized over the last several years, we recommend that Fairfax County join with VDOT in evaluating this problem and investigate options for utilizing this investment more cost-effectively by using the best of available proven software designed for real-time changes in traffic flow. *

Evaluation:
• As recommended in the last bullet above under “Principal Recommendations” Fairfax County should enter into an agreement with Cambridge Systematics, the firm that performed state-of-the-art transportation analysis for the development of the Tysons Plan, as soon as possible to train County DOT staff in the use and application in Reston of the post-processing TOD planning model used in the Tysons Plan development process. Fairfax County staff currently plans to perform an evaluation of possible future development in the Reston station areas under the current Comprehensive Plan language. This evaluation work should include an application of Cambridge Systematics’ post-processing model under the guidance of that firm’s staff. Then a similar process should be used in evaluating the recommendations of the RMPSS Task Force, followed by an interactive application of that model in an effort to refine and enhance the Task Force’s recommendations.

Monday, August 23, 2010

Notes on RTF Town Center Committee Meeting, July 27, 2010, John Lovaas

This morning's RTC meeting in the comfy confines of the Clubhouse showed how far along this group is and it showed the developer community interest interest in the process. Present this morning were: Subcommittee members-7, 5 developer community and 2 civilians by my count; Chair PNicoson and HMerkle from DPZ; and 18 observers--13 developers/landowners and 5 civilians. This is typical of last several meeting, in fact.

Chairman Goudie opened by announcing that agenda today was discussion of latest draft committee report, prepared by RGoudie and POtteni (BP). DRAFT would be presented to TF plenary tonight. Next Subcommittee meeting will be August 17 and will be devoted to public comment. Hope to wrap up work at August 24 meeting, but August 31 meeting possibility kept open. PNicoson said Subcommittees now had until September to finish.

Today's topics:

-brief public comment round: Concern expressed re: proposal in draft to change 1:1 Residential to Commercial to drop all retail and hotel from commercial side and leave them as a separate category. Result would be reduced residential units, below straight 1:1 levels which was already a compromise!
Concerns over connectivity among the 4 "republics" in RTC; excessive development and missed civic opportunities in north Town Center.
Dave Edwards not happy with report dismissing air rights, asked if Doug Carter could speak to this question....

Air Rights

Doug Carter eloquently made case for keeping Air Rights option open, leading with the reminder that land values of course were an issue with platforms and all, but MWAA owned (lease from Feds until 2067, actually) the land upon which air rights would be built and pylon base could come from airport trust fund (airline fee funded). He also pointed out the signature landmark and north-south connection advantages. Only MLooney sounded cautionary note, but Patty Nicoson and several others spoke up in favor of changing report language from simple dismissal of concept to expressing favorable view of MWAA going ahead with pylons to preserve important possible future development option. Goudie agreed. No big developer objection now--and no cost to them.

Residential to Commercial balance

Most of the rest of the meeting devoted to this. Lots of discussion of how proposed 1 sq. ft : 1 sq. ft (residential to commercial space) applies. My understanding is that if a developer wants new development on his (interestingly, all but one of the scores of developers and lawyers, etc I've seen in 3 months were men!) land, the 1:1 ratio does not apply to his by-right developement, i.e., within his existing approved zoning F.A.R. Should he want additional F.A.R., he is subject to the 1:1 requirement for everything. But, he can make deals to trade for residential credit, e.g., if another parcel owner has excess residential above the 1;1. I think!
While the 1:1 had been arrived at as a compromise between the lower residential standard developers sought and the higher residential (up to 4:1) passionately pushed by Joe Stowers to improve the overall Town Center ratio which now stands somewhere between 8 and 16 to 1 (commercial to residential, but no one agrees on an exact number!). Joe argued forcefully that higher residential would yield higher worker component, reduce peak traffic and make for more vibrancy than with continued high commercial tilt.

Now, developers sought to reduce the 1:1 compromise (which RGoudie said repeatedly "over time will bend the curve of the high ratio of Comm to Res ) by exempting certain categories from inclusion in commercial calculation.
While Robert argued back and forth for a while, he gradually backpedalled on all counts.

First, it was agreed that hotels would be exempt (except for major conference areas which operated like offices in terms of contributing to traffic peaks)--then he seem to back away from that, too. Then, retail was discussed, and again RGoudie initially fiercely argued it be treated in commercial part of ratio, then backpedalled and agreed to exempt retail as well.

As the subject seemed to be hitting exhaustion, the developers wondered if all civic facilities, amenities--schools, theatres, etc shouldn't be explicitly exempted as well.

The smoke cleared with one of Rae Noritake's wonderful self-adjusting visuals, a multi-colored table which showed the number of residential units falling from over 11,000 at 3.5 F.A.R. when calculated at a straight 1:1 ratio down to about 8,000 after hotels and retail were exempted. We did not get to further calculations as other categories were mentioned.

I think at the end, 1:1 was declared to be the target ratio for Residential to OFFICE (far narrower category than commercial).

Civic Uses, schools, ballfields, open space

Terri Phillips gamely tried to get things like schools, ballfields, services, other public amenities, civic uses discussed as being as important as retail, for example. She seemed to want wording included calling for inclusion of provision for such other uses and recommendations for using large amount of county land to contribute to such uses. She did not get far. In fact, Robert responded by claiming that they had already made lots of provision for open space. The discussion cut off and went on to...

Big Green Space on strawman map in middle of South Metro

One very PO'd developer objected to RGoudies "placeholder" big (+/- 6 acres) green space in the middle of TC Metro South. Robert was using the green shaded area to call attention to Park Authority suggestion that large multi-use green spaces centrally located are very popular, provide substantial relief to intense, especially among large commercial structures. Problem was the offending green was set so it took a big chunk off this one owner's land and he claimed (rightly I think) it was not equitable. It was pointed out it was a strawman and NOT an agreed map. No matter, said the owner, if it goes on big screen before the public, it becomes real and can never be changed--way overstated , but made his point.
Big green area was quietly erased, replaced by little dots of green sprinkled around south side after this morning's meeting.
Task Force saw revised map tonight.

On that note meeting ended.

Sunday, August 15, 2010

Supervisor Hudgins' Response to RCA Letter on Trans-Toll Road Connectivity, August 12, 2010

August 12, 2010

Dear Ms. Stillson:

Thank you for your letter regarding your offer to form or participate in a group that could promote an additional crossing of the Toll Road as well as your efforts to inquire about possible federal funding.

Our office has been in touch with Rep. Jim Moran's office regarding additional federal funding for this alignment and a copy of your letter has been forwarded to his staff. While you may not be aware, Rep. Moran has been instrumental in obtaining much of the $3.1 million needed for a pedestrian crossing at Trap Road that has been considered a priority for safety and to connect with other non-motorized facilities. There is a feeling that this project needs to be completed before additional federal funding can be requested.

The Wiehle Avenue Station Access Management Plan (RMAG) study (chapters 2 and 4) addresses a Toll Road crossing at Soapstone Drive to include a dedicated bus lane. RMAG recommendations have become county transportation priorities and staff is currently seeking all possible funding sources. The RMAG recommendations note the importance of this connection in reducing congestion and providing necessary access to the station. While an RMAG status report is a regular part of the quarterly HMD TAC meetings, we will be asking for a separate report on the Soapstone Drive Connector for the November meeting to address you rinterest in the issue. Of course the HMD TAC meetings are open to the public and you are encouraged to attend or send an RCA representative.

Copies of your letter have been forwarded to appropriate county staff and to Rep. Moran's office. Should you need additional information, please let us know.


Sincerely,

Catherine M. Hudgins


CMH/mlp

Friday, July 30, 2010

Notes from RTF Vision Committee Meeting, July 28, 2010, Tammi Petrine

Present:
John Carter, Chair
Sandy Smith, Fred Costello, Joe Stowers, Kohann Williams, Bob Simon, Patti Nicoson, Terri Phillips, Guy Rando, John Lovaas, John Bowman, Art Murphy, Judith Pew, Susan Mockenhaupt, Dave Edwards, Dick Stillson, Tammi Petrine

John Carter: opening remarks:
• Thought TC sub-committee’s presentation was extremely impressive.

• Introduced revised planning principles and opened discussion. Because there were several areas of concern, John asked for panel to review principles and send him re-writes so that principles can be approved by the next meeting and presented to the sub-committees for inclusion in their reports to the Task Force.

• Interesting discussion on “meaningful community participation” being involved with the review of development and the staging of redevelopment ensued. John Lovaas tried to suggest an independent P & Z but was contested by Simon, Williams and Nicoson that the principles should be general and not that specific.

• Lots of discussion on the need for a frequent, free, continuous, community-wide circulator bus service if traffic is to be manageable; Terri Phillips discussed the TC sub-committee’s insistence on a circulator system within TC also.

• Bob Simon discussed what a Village Center should be:
1. No one-story buildings; all mixed use
2. All buildings organized around a hard surface plaza/ gathering place
3. Community or civic building present in some form.


Tonight’s Subject: Environmental Concerns in the Dulles Corridor and Town Center
• John Carter had prepared a slide show with maps to illustrate the location of streams, wetlands, ponds, forests, pathways/trails and open spaces incorporated into the current Reston landscape.
• Bob Simon stated that Reston was going to be all urban and all of the “natural areas” except the nature center needed to be bulldozed and reformed to create a less nuisance-filled environment (no twigs, leaves, etc.) Settings should look good and “natural” without being natural. His hero is the landscape architect, Capability Brown who espoused and practiced this M.O.

MWAA: Judith Pew brought up a discussion from the TC sub-committee that indicated that MWAA was unaware of plans for any of the trans-tollway crossings planned in the revised master plan and stated that Fairfax Co. needed to notify them immediately where they are needed as pilings need to be set for them ASAP and can NOT be done later. Airport fees will pay for the pilings. Crossings identified were: Reston Parkway widening; Reston Heights/Plaza America; Soapstone extension; South Lakes Overpass and one pedestrian/bike bridge.

John Carter referred to Reston 2020’s Binder articles and recommended them as a reference for use by the Vision Sub-Committee. Dick Stillson reinforced by mentioning the content of the binders and referred panel members not having a binder to the 2020 web-site.

In closing panel comments, Art Murphy expressed concern that when the larger Reston community learns of the extent of the changes proposed for Reston, massive protests will result.

Note: John Carter is an exceptional group leader; warm, welcoming, inclusive and effective. He is to be commended.

Tuesday, July 20, 2010

Reston Town Center Committee Summary, July 20, Dick Rogers

Process issues: Thursday morning will be a special meeting of the committee, at 7:30AM (morning!) if I got it right. Robert hopes to put forth a revised NTC draft.

There was some committee sentiment that the timetable should be adjusted to give the committee more time--many significant issues not discussed. Otteni said a formal decision on this should be made Thursday. Otherwise, Robert still plans public comments AM 27 July and presenting to the TF night of 27 July.

Robert hopes to have extended discussion of open space issues on Thursday and has invited Sandi Stallman of FCPA. (Stallman is pushing for more active open space playfields to be put in place.)

Substance: Air rights. Robert had a phone discussion with the MWAA planning man. What MWAA is studying is putting in pilings/supports now for an air rights platform. The platform would come much latter. They still are trying to get someone in Thursday from MWAA.

Doug Pew said that at his trails meeting, the news was that Metro plans to shut all station accesses when Metro is closed. Supposedly this decision is made at the "highest level" in metro. Tysons, like Reston will be cut in half at night. In this connection, the RPway station designer apparently will be part of the WMRAA party on Thursday--he is supposed to finalize a station design by mid-August.

James Campbell Co presented their tentative plans for TOD development in E-4 west adjacent to the station. Commercial on DTR, residential in back, retail all over. They sounded pretty responsible and were taking into account the issue of access from points south and west of them.

Civic uses: Robert Goudie said he was "dead set" against the Committee specifying civic uses. That should be left up to the Community. This was in the context of a performance center in BP land. Some discussion that south side developers adjacent to the station might be required to kick in $ toward this to get a 5 FAR. BP apparently is hoping someone else would build the "public amenity."

Density: Much of the meeting was a rambling discussion of density and residential-commercial ratios. The various material sent around (Maynard, Stowers, Costello) has made Robert skittish on this issue; he sticks with a 1 to 1 ratio and said repeatedlyd that no one had sent him "proof" that more residential would work or was part of TOD approaches. His developer allies on the sub-com, however, deserted him and were actively pressing for more flexibility. By 4 to 1 they wanted a tiered structure--a FAR of 3 would need be only 30% residential going up to 1 to 1 for a 5. Stowers was not present to argue his case.

Monday, June 21, 2010

Feasibility of development over Dulles Toll Road studied, The Washington Post, June 21, 2010

By Jonathan O'Connell

The Metropolitan Washington Airports Authority is studying the feasibility of selling the right to develop over the Dulles Toll Road, a potential source of millions of square feet of new housing and offices near Metro stations planned in the second phase of the rail extension to Dulles International Airport.

In April, the airports authority's board agreed to perform a $150,000 study of the engineering requirements and costs associated with incorporating plans to build mixed-use developments atop the toll road as a revenue generator. E. Lynn Hampton, president and chief executive of the airports authority, said Reston Parkway Station, the furthest east of the second-phase stations, near Reston Town Center, will be examined as a test case.

Hampton cautioned, however, that consideration of the sale or leasing of air rights was in the "very, very early stages." She expects to see the results this fall.

"We don't have any plans, any thought at all, about a project," she said. "What we're trying to do is determine if it's a good thing to do, what does it cost to do this and is that cost recoverable through commercial development."


For the rest of this article, click here.