Tuesday, August 14, 2012
Secretary LaHood, et al, Letter to MWAA, None of which Reduces Future Huge DTR Toll Increases
Sign the No Toll Increase petition at http://notollincrease.blogspot.com/p/sign-petition.html
The only real way to stop MWAA from imposing drastic toll increases to build Dulles Rail is for VDOT to take the DTR back, and the rail project too. The DTR Permit and Operating agreement gave MWAA until Dec. 31, 2015 to complete the entire project. https://docs.google.com/open?id=0B64IfZTFiYIASmcxVUpqOXhXQzg
Two weeks ago, MWAA requested an extension until Dec. 31, 2018. https://docs.google.com/open?id=0B64IfZTFiYIAMTV2dEUzUktia0U It's time to say no to continued abuse of our commuters for this corrupt organization's insider deals.
Rail costs to be paid by toll road users have increased 250% since the Final Environmental Impact Statement was published in 2006, from $875M to $3B+. https://docs.google.com/spreadsheet/ccc?key=0AgsBUoSsmfqrdHZNSllnd293eDBMbjBPRHdaOW05LXc
In contrast to the position of No Toll Increase above, RCA Reston 2020's position has long been that Dulles Toll Road users should pay 25% of the cost of the Silver Line's construction as laid out in the 2004 FEIS financing plan. This would still require substantial toll increases--but less than half those MWAA has forecast--that would encourage shifts to public transit while not over-taxing toll road users, shifting too much traffic to local roads, or lowering the Dulles Corridor's economic growth prospects.
Sign the No Toll Increase petition at http://notollincrease.blogspot.com/p/sign-petition.html
ReplyDeleteThe only real way to stop MWAA from imposing drastic toll increases to build Dulles Rail is for VDOT to take the DTR back, and the rail project too. The DTR Permit and Operating agreement gave MWAA until Dec. 31, 2015 to complete the entire project. https://docs.google.com/open?id=0B64IfZTFiYIASmcxVUpqOXhXQzg
Two weeks ago, MWAA requested an extension until Dec. 31, 2018. https://docs.google.com/open?id=0B64IfZTFiYIAMTV2dEUzUktia0U It's time to say no to continued abuse of our commuters for this corrupt organization's insider deals.
Rail costs to be paid by toll road users have increased 250% since the Final Environmental Impact Statement was published in 2006, from $875M to $3B+. https://docs.google.com/spreadsheet/ccc?key=0AgsBUoSsmfqrdHZNSllnd293eDBMbjBPRHdaOW05LXc
In contrast to the position of No Toll Increase above, RCA Reston 2020's position has long been that Dulles Toll Road users should pay 25% of the cost of the Silver Line's construction as laid out in the 2004 FEIS financing plan. This would still require substantial toll increases--but less than half those MWAA has forecast--that would encourage shifts to public transit while not over-taxing toll road users, shifting too much traffic to local roads, or lowering the Dulles Corridor's economic growth prospects.