Reston Spring

Reston Spring
Reston Spring

Friday, March 7, 2014

Street Lights and Crime: A Seemingly Endless Debate, The Atlantic Cities, February 12, 2014

This article by Mike Riggs highlights an issue as old as Reston itself:  To street light or not.  Here are some excerpts:
If you live in a city and walk alone at night, you probably prefer routes that are well-lit over ones that aren't. The same surely holds true even if you live in a more suburban area. Associating light with safety is one of those feelings that's so universal, I can almost hear the entire planet rolling its eyes in collective irritation right now. 
But what if extra lighting doesn't actually make us safer?
After the London borough of Wandsworth installed 3,500 new street lights in the mid-1980s as part of its overall crime reduction plan, researchers at the University of Southampton decide to compare reported crimes before and after the upgrade. Despite the fact that increased lighting had been a mainstay of city crime prevention for decades, the researchers found "no evidence ... to support the hypothesis that improved street lighting reduces reported crime." 
Cities in the U.S. attempted similar experiments during the same period of time, and got mixed results. . .
And this article's bottom line:
The connection between light and crime may not be what most of us think it is, but the connection between light and our sense of safety is exactly what it's always been. . . .
But, of course, safety is not the only reason to have street lights.  Being able to see where you're going (& be seen by others), especially as an automobile driver, is an important reason.  On the other hand, there are good reasons not to have street lights, such as environmental and energy considerations.

. . .  so we will continue to debate the issue in Reston and elsewhere.  

Click here to read the full article. 

The editorial cartoonists are now piling on the Silver Line debacle...

From the Washington Post, Tom Toles shows the similarities between the Metrorail we have and the Metro that is being built....

And this week's Fairfax Times picks up on the theme of shoddy workmanship in the Silver LIne.



Unfortunately, these are truths--and they hurt Reston as well as Tysons, Herndon, DTP, MWAA, and WMATA!



Editorial: No silver linings for Metro, Fairfax Times, March 7, 2014

The first phase of the Silver Line Metrorail project, which will run from Falls Church to Reston’s Wiehle Avenue, was originally slated to be completed in December.
That target softened a bit last summer when MWAA officials said “a few more weeks” were needed to firm up a handful of safety and performance issues.
Well, December became January, which turned into February, which extended to March, which may eventually lead to a summer without Metrorail service in western Fairfax.
To call this a missed opportunity for Metro is akin to calling Mount Everest a good-sized mountain. Given the many problems the beleaguered transit authority has dealt with in recent years, a smooth, timely launch of the Silver Line would have provided a much-needed public relations boost.
Instead, would-be Metro riders are being told that Dulles Transit Partners, the Silver Line’s lead contractor, was deficient in seven of 12 areas required by MWAA to meet “substantial completion,” the point at which MWAA can begin to turn over the Silver Line to the Washington Metropolitan Area Transit Authority, which will operate the rail line as part of the Metro system.
Reaching that milestone may take awhile. In addition to missing safety certificates and problems with the automatic train control system, project inspectors discovered problematic elevators and escalators, water leaks in buildings and a handful of other issues that will require time and money to resolve. . . .
Click here for the rest of this critical editorial.  

Thursday, March 6, 2014

Reston Community Center Tax (aka Small Tax District #5) - What is it??, Connie Hartke, March 6, 2014

Are you a Reston property owner?  Then you most likely pay an additional tax that was set in place almost 40 years ago.  See Small District 5 boundaries at http://bit.ly/smalldistrict5.  If your property is in this District, commercial or residential, this means that you pay an extra property tax called the Reston Community Center tax (sometimes referred to as Small District #5 tax) in addition to the County taxes that all property owners pay.

If you aren’t sure what this tax is for, you are not alone.  I didn’t understand it either until about a year ago and thought I would share what I’ve learned. 

A special tax district for Reston was established in 1975 by the Fairfax County Board of Supervisors.  Its purpose was to construct, maintain, and operate a community center paid for by Reston property owners.

The Reston Community Centers (RCC) at Hunters Woods and Lake Anne are the result of this special tax for Small District 5.  The RCC is funded only by program/facility fees and this tax that is over and above the standard County property tax. There is no contribution from Fairfax County tax revenue.  More details on the RCC and its funding can be viewed at www.fairfaxcounty.gov/dmb/fy2014/advertised/volume2/40050.pdf. 

A “Notice of Real Estate Assessment Change” arrived in mailboxes recently.  It tells how much the assessed value of your property changed, but doesn’t shed light on how much the increase --which occurred for 88% of Reston’s residential properties -- will cost you.  If you can’t locate your Notice, look up your address at this county website: icare.fairfaxcounty.gov/search/commonsearch.aspx?mode=address.  Either of these will give you the property value from which your taxes are calculated.

The current Fairfax County tax rate that all County property owners pay is 1.085 per $100.   To make the math simpler, multiply $1,085 per $100,000.  To calculate the amount you contribute to the Reston Community Center, multiply $47 per $100,000 of your property’s assessed value.

A few examples of the Reston Community Center tax:


      Reston Community Center Tax - $47 per $100,000 valuation
in addition to your Fairfax County Tax
  • Property assessed at $250,000 =  $117.50/year
  •  Property is assessed at $500,000 =  $235/year
  •  Commercial assessed at $2 Million = $940/year
Please share this information with your neighbors.  I have found that long time residents as well as our newest residents don’t necessarily know this information.  As Reston continues to grow and develop, its citizens will be asked to weigh in on various decisions, either by vote or by input to our County Supervisor.  It is more important than ever to understand how items are funded and how the outcome can affect you and our community now and for years to come.

Connie Hartke is a member of the RCA Board of Directors, President of Rescue Reston, and co-owner of a Virginia real estate school.  

Colin Mills: Soapstone Connector Is Good Work In Progress, RestonNow, March 6, 2014

Colin Mills/File photoSpring and the Silver Line opening both feel a long way away right now. When you’re digging out from the latest snowstorm and reading about MWAA’s declaration that the line isn’t ready for turnover to Metro, it’s hard to convince yourself otherwise.

But believe it or not, we are getting closer to both. In the case of spring, the vernal equinox is on March 20, just a couple weeks away. (The real beginning of spring, baseball’s Opening Day, is a week and a half later.) With the Silver Line, unfortunately, we don’t yet have a firm opening date. But each day that passes brings us closer to both long-awaited events. For now, all we can do is wait.

In the meantime, we can pass the time by preparing for the impacts that the Metro will bring to Reston. The most notable of these is traffic. As RCA has stated repeatedly, new crossings of the Dulles Toll Road are key to easing congestion around the Silver Line stations. And of the proposed new crossings, the Soapstone Connector is the furthest along.

Last month, the County Department of Transportation presented the latest on the Soapstone project to the Hunter Mill Transportation Advisory Committee. RCA Vice President John Hanley attended the meeting, and he gave the Board an update last week. The good news is that the county understands the importance of the project and is moving it along; however, there are a couple of major questions that must be resolved before this important link in Reston’s transportation network can be built.

The last time I wrote about the Soapstone Connector, back in May, the County was evaluating several proposed alignments for the connector. They alignment has now been selected; it’s a hybrid of a couple of the previous options.

And on the whole, it looks pretty good.

On the south side, the connector links up with Soapstone Drive, which is a definite plus.  You might have assumed this was a given, since the project is called the “Soapstone Connector,” but several of the alternatives would not have connected to Soapstone.)  The alignment passes through the existing National Association of Secondary School Principals building and generally follows the western side of Association Drive before crossing the Toll Road.

On the north side, the connector will run to the west of the BAE Systems building and the gas pipeline, and east of Plaza America, before ending at a signalized intersection with Sunset Hills Road. The connector will consist of two lanes over the bridge and three lanes on either side (two travel lanes and a turn lane), as well as bike lanes, a sidewalk, and a shared-use trail. The connector will not provide access to the Toll Road, but it will serve as a relief valve for crosstown traffic and for those trying to access the Wiehle station from the south and west.

This alignment seems like a worthy compromise. It’s a little farther away from the Wiehle station than would be ideal, but it connects directly to Soapstone Drive and requires relatively little disruption of existing properties.  Constructing two lanes over the Toll Road instead of four holds down the overall cost of the project, and the bike lanes and trails encourage pedestrian and bike travel to the station.

Sounds like a plan, right? Well, there are a couple things that still need to be dealt with before the plan can become reality.  The biggest ones are the challenges that face any infrastructure project: time and money.

When will the Soapstone Connector be ready?  We don’t know. Ideally, it would be in place when the Wiehle station opened, to divert some of the traffic from the immediate vicinity of the station. That obviously won’t happen, but will it be ready during the years when Wiehle is the end of the line? Probably not. The project hasn’t even begun preliminary engineering yet; it’s not certain that construction will even occur during this decade.

Part of the reason for that is the issue of funding. The current cost estimate for the project is $92 million, although that’s only a rough guess at this point. Whatever the final cost, it’s certain to be a significant outlay. And so far, the County has allocated only $2.5 million for further planning and study.

Where will the rest of the money come from? In all likelihood, funding will have to come from several sources.  Hopefully, developer proffers will be a piece of the puzzle. But of course, that money wouldn’t be available until redevelopment starts around the stations. And that depends on economic conditions, among other things.

Presumably, the Soapstone Crossing will be a key topic of the “inclusive process” on transportation funding that the Supervisors called for when they approved the revised Comprehensive Plan last month. RCA looks forward to participating in that process. If we’re going to prevent the Toll Road corridor from becoming a barrier that divides our community in half, we must figure out how to pay for the transportation infrastructure we’ll need. This is perhaps the most important implementation question that we face as we prepare for the transformation of the Toll Road corridor, and RCA is ready to be involved in finding the solution.

In the meantime, we find ourselves waiting, just like we’re waiting for spring and the Silver Line. But I am encouraged that the County is making progress on the connector, and that they’ve selected an alignment that makes sense. RCA will continue watching both the Connector and the Silver Line. We’ll keep you informed and keep advocating for solutions that maximize the benefits and minimize the costs to our community.

As for spring… sorry, you’re on your own there.

Colin Mills is the president of Reston Citizens Association. He writes weekly on Reston Now.

Sunday, March 2, 2014

A Community Center for All Income Levels, New York Times, February 27, 2014


IMG_6082
The Manny Cantor Center (Manny Cantor Center website)
The center, which recently underwent a $55 million renovation, has a large and impressive gym to which fees are paid on a sliding scale. Families living in one of the area’s many public housing projects pay $10 a month; those living in one of the neighborhood’s many middle-class co-op developments, built by labor unions in the middle of the last century, might pay more; and those living in $2 million lofts in the building that used to house The Jewish Daily Forward pay the top rate of $87 a month. The gym opened a few weeks ago, and so far the project’s intent would seem to have been realized, with approximately a third of members coming from public housing, a third coming from the co-ops and a third from luxury properties on the Lower East Side. Art classes at the center will have a similar fee scale.
What is inspiring about the center is how little it seems motivated by noblesse oblige. As part of its commitment to communitarianism, the center houses both a Head Start preschool program and a private preschool for those in the area who can afford it. The classrooms are side by side.  . . .
Click here for the rest of this article.

Proposed Soapstone Drive Connector Project, John Hanley, March 1, 2014



1. SCOPE, TIMING AND COST

The Soapstone Drive Connector Project, #15 in the Fairfax County (FC) Revised Recommended Priority Project List, is planned for funding during the period FY 2015-2020. It is intended to provide a crossing for cars, bicycles and pedestrians over the Dulles Toll Road (DTR) between Sunrise Valley Drive and Sunset Hills Road.

The project has received approval for planning level funding and $2.5 million has been allocated for ongoing study and evaluation. Located in Hunter Mill District, the Soapstone Connector (SC) represents a major undertaking and is estimated to cost $92 million. At this early stage, FC believes that this sum will not necessarily represent the eventual CapEx. Several buildings are likely to have to be demolished and depending on redevelopment plans, developers’ proffers may reduce FC’s outlay.

It is unlikely that the SC project, even if the proposed plan is approved soon, will be constructed this decade.  As the County states in its priority listing, its construction will hinge on the availability of further funding and favorable market conditions.

2. ROUTE OF THE PROPOSED CONNECTOR

Fairfax County Department of Transportation (FCDOT) reviewed five different routes from the end of Soapstone over the DTR. In FCDOT’s words, “…none of the alternatives emerged as superior”. Eventually, the Department compromised with a hybrid route. This still has to be approved by the FC Board of Supervisors.

The hybrid route begins directly across from Soapstone, traversing Sunrise Valley via a signal controlled crossing. Its proposed route broadly follows the western side of Association Drive, impacting several properties and buildings, particularly the present HQ of the National Association of Secondary School Principals.

It is anticipated that, that appropriate at grade intersections will be incorporated both to the south and north of the DTR along the connector route, so as to provide access to properties along the route.

Soapstone, as it approaches Sunrise Valley, consists of two active traffic lanes, with a center lane for turning, plus two bicycle lanes. This represents a cost advantage for the actual crossing bridge over the DTR, since it will only need to consist of two lanes (no turns on the bridge), two bicycle lanes and one shared use path. Nevertheless, the bridge crossing will require the construction of significantly high and substantial ramps to support it as it traverses the corridor.

As the connector heads north after crossing the DTR, it enters a clear area, before its route affects several properties prior to its end with a proposed signal controlled junction at Sunset Hills to the west of the BAE complex in front of the electrical transformer installation to the north.

3. CONCLUSION

All in all, the hybrid connector route appears to be a good choice. While it joins Sunset Hills further west than some might like, it does provide a clean intersection at Sunrise Valley Drive (rather than an offset second intersection) and follows a route that minimizes disruption of the present building/property fabric. All of the other alternatives would appear to require the same ramp construction noted above.

March 1, 2014

John Hanley is Vice President of Reston Citizens Association and a member of the Reston 2020 Committee Coordinating Committee. 

For the viewgraphs used in the recent County presentation, please click here.  The specifics of the County's approved transportation capital investment priorities is available here.